Repair works at Vaturu on schedule: WAF

Listen to this article:

WAF contractors Elisha Engineering Co. Limited crew members conducting repairs. Picture: SUPPLIED

WATER Authority of Fiji (WAF) contractor Elisha Engineering Co. Limited continues to carry out repairs on the main pipeline along Batiri in Vaturu.

WAF general manager Customer Services and acting GM Operations Sekove Uluinayau said the repairs involved heavy metal works that required cutting of steel pipes, grinding and welding.

He said the repairs were on schedule and more updates would be provided accordingly.

“Additionally, WAF continues to cart water to the affected areas in the Lautoka area – to refill the 100 water tanks which have been strategically placed as well as house to house cartage for certain areas,” Mr Uluinayau said.

More in tomorrow’s edition of The Fiji Times.

Array
(
    [post_type] => post
    [post_status] => publish
    [orderby] => date
    [order] => DESC
    [update_post_term_cache] => 
    [update_post_meta_cache] => 
    [cache_results] => 
    [category__in] => 1
    [posts_per_page] => 4
    [offset] => 0
    [no_found_rows] => 1
    [date_query] => Array
        (
            [0] => Array
                (
                    [after] => Array
                        (
                            [year] => 2023
                            [month] => 12
                            [day] => 29
                        )

                    [inclusive] => 1
                )

        )

)

No Posts found for specific category