FRA begins rehab works on MacGregor Rd

Listen to this article:

Picture: FILE

THE Fiji Roads Authority will be commencing rehabilitation works on MacGregor Road in Suva from 8.30pm tonight (Tuesday 17 December), weather permitting.

Works will begin daily from 8.30pm to 5am and 9.30am to 4pm for a week.

The works will target the reconstruction of the worst pavement section of MacGregor Road from Bau Street roundabout to Denison Street junction.

As a consequence, the road will be temporarily be reduced to a single lane and detour routes will also be provided.

Full traffic management will be present on-site to guide motorists safely.

FRA stated the works were necessary because the section was severely deteriorated and could no longer be maintained through pothole repairs, hence the need for urgent long-term rehabilitation works.

The FRA said this was the first of many roads in Suva that would undergo the same treatment over the next 12 months.

Travelers along this area are advised to take this notice into account when finalising travel plans.

Array
(
    [post_type] => post
    [post_status] => publish
    [orderby] => date
    [order] => DESC
    [update_post_term_cache] => 
    [update_post_meta_cache] => 
    [cache_results] => 
    [category__in] => 1
    [posts_per_page] => 4
    [offset] => 0
    [no_found_rows] => 1
    [date_query] => Array
        (
            [0] => Array
                (
                    [after] => Array
                        (
                            [year] => 2023
                            [month] => 12
                            [day] => 28
                        )

                    [inclusive] => 1
                )

        )

)

No Posts found for specific category